Stage Production Specifications
Stage Information
Stage Measurements
Calculated from the centerline of the stage and/or the upstage edge of the smoke pocket – 0', 0".
Proscenium Stage
- Height of proscenium opening to fixed valance: 24'-9"
- Width of proscenium opening to edge of plaster: 54'-8"
- Deck to the walking surface of the grid: 70'-0"
- Upstage edge smoke pocket to back wall: 37'-2"
- Upstage edge smoke pocket to front of apron at center: 4'-9"
- Upstage edge smoke pocket to front of apron at proscenium: 4'-9"
- Upstage edge smoke pocket to house curtain pipe: 1'-4"
- Upstage edge smoke pocket to 1st avail working set of lines: 2'-0"
- Upstage edge smoke pocket to last avail working set of lines: 36'-0"
- Center line to stage left wall, unobstructed: 47'-4"
- Stage left wing space off-stage from proscenium: 20’-0”
- Center line to stage right fly rail: 52'-5"
- Stage right wing space off-stage from proscenium: 25’-1”
- Stage right fly rail vertical clearance: +32'-9" (Mid-level Loading Gallery & Pinrail platform edge at +32'-9" starting at 42'-0" SR of centerline.)
Other Measurements
- Road mix position: 10' x 22'-6"
- Located 15'-3" to 37'-9" house-right of the house centerline.
- 117' from fire curtain line to the near edge of the mix position.
- Lighting control booth windows to fire curtain line: 149'
- Spot booth window to fire curtain line: 175'
- C-vom projector position to fire curtain line: 93'
- Balcony edge projector position to fire curtain line: 118’
Line-Sets
- Counterweight system/single purchase
- 11,000 lbs. counter weight
- 48 available sets
- 5 lines per set/70' house pipes
- High trim of house pipes +62'-6” from deck
- 104 upright loft blocks provided for 52 spot lines. 5/8" UltraStrong ®, 3 strand twisted lay rope.
- 1 block & falls
- Pin rail located stage right Mid-Level Gallery at + 32'-9"
- House battens are 2” schedule 40 pipe or 12” aluminum ladder truss
House Curtain
Gold buillotine and gold legs on a traveler track
- Operated stage right deck, not at Locking Rail.
Orchestra Pit
- Front of orchestra pit to apron at centerline 13'-0"
- Front of orchestra pit to apron at off-stage edge 6'-6"
- Orchestra pit extension under apron at center 0'-0"
- Orchestra pit side to side at apron 50'-4"
- Adjustable hydraulic pit
- Curved railing
Load In/Out
South Dock / USL
- One (1) truck loading dock. (Push distance between stage and dock is flat and level, approximately 16'.)
- Door is 6’-8” W x 9’-5” H
- Freight elevator to basement – 5’-9” x 5’-3” with 1000 lbs. max load, no passengers allowed.
- Forklift not possible on the south dock or stage. Forklift in street possible, but not available unless ordered in advance.
North Dock / USC
- Two (2) truck loading dock (Push distance between stage and dock is approximately 100'.)
- Doors are 8’-7” W x 13’-4” H
- Small forklift available in-house for stacking/un-stacking. North loading dock area only.